Carrier 53QPCT18H-708F Installation Manual page 21

Table of Contents

Advertisement

INDOOR UNIT INSTALLATION (Cont.)
INSTALLATION STEPS OF INDOOR UNIT (Cont.)
Step (8): Passing refrigerant piping,
electrical cords and drain
hose of indoor unit through
wall sleeve.
Passing refrigerant piping lines through the
wall sleeve is done before hooking the
indoor unit body onto the top of the wall
hang bracket.
For left piping, hang the unit onto the top
of the wall hang bracket and incline the unit
using a tool such as a screw driver set
between the middle area of body and bottom
right of the wall hang bracket.
Connecting the piping can be done more
easily if the unit is inclined.
WARNING
Do not supply power to the indoor unit until all
refrigerant piping and electrical wiring to the
outdoor unit are completed.
Step (9): Installing the Indoor Unit Body
to the Wall Mounting Bracket
Snap the marking places of the body ( ▼)
onto the hole of the bracket.
NOTES
In case of removing the unit from the wall
hang bracket after installing it onto the wall,
remove it by pushing up the indicated marks
( ▼) at the bottom of the body.
NOTE
After installation of unit, if there is a significant
gap between the unit and wall, securing 2
screws to the body and wall-hang bracket can
adjust it.
Refer to the screw hole locations marked ( ▼)
at the bottom of the body.
Wall mounting bracket
340
19
Wall
Hook
Hole
270
Grille
Front panel

Advertisement

Table of Contents
loading

Table of Contents