Download Print this page

Yunca Gas WEGJ 2000 Installation Instructions page 3

Freestanding

Advertisement

NOTE: A WATER BOOSTER CANNOT BE FITTED IN CLEAN AIR ZONES
750
Ash Floor Protector
FIG.D: HEATER POSITION
25 mm AIR
GAP
5
0
53
5
88
5
30
0
Above: Non combustible wall clearances. Brick lining from
floor to within 25mm of ceiling. Leave air vents at the bottom to
allow airflow in the cavity. If Yunca flue mounted shield is fitted,
brickwork may be 1200mm high as long as all vertical joints in top
and bottom of brickwork are left out to allow airflow when
brickwork is capped.
P
D
C
FIG D: MINIMUM FIRE TO COMBUSTABLE WALL CLEARANCES – WEGJ 2000 (SUB 1.0)
(WITH YUNCA FLUE MOUNTED SHIELD FITTED). Measurements in millimetres.
A
B
100
200
FIG D: MINIMUM FLOOR PROTECTION MEASUREMENTS
(WITH YUNCA FLUE MOUNTED SHIELD FITTED). Measurements in millimetres.
C
D
300
100
Wegj 2000 Installation Instructions - AUG_2014.doc
300
760
(not to scale)
10
0
950
.
Min
J
O
D
K
E
F
30
325
J
K
950
935
FIG E: FLUE SYSTEM REQUIREMENTS
600
225
535
F
N
G
H
575
454
L
M
1247
1147
www.yunca.co.nz
471
A
C
B
G
D
D
O
J
L
E
N
D
E
C
D
H
M
N
O
610
750
(not to scale)
130
393
K
H
P
635
Page 3 of 4

Advertisement

loading