Siemens M65 Service Manual page 35

Hide thumbs Also See for M65:
Table of Contents

Advertisement

S I E M E N S P T E L T D
M65 Level 2 Service Manual
Final Inspection:
The final inspection contains:
1) A 100% network test (location update, and set up call).
2) Refer to point 3.3.
3) A random sample checks of:
- data reset (if required)
- optical appearance
- complete function
4) Check if PIN-Code is activated (delete the PIN-Code if necessary).
Basis is the international standard of DIN ISO 2859.
Use Normal Sample Plan Level II and the Quality Border 0,4 for LSO.
Remark: All sample checks must be documented.
Copyright © Siemens Pte Ltd.
All Rights Reserved
ICM MP CCQ SLI RHQ
Page 35 of 37
Siemens Technical Support Centre
Company Confidential
May 2004

Advertisement

Table of Contents
loading

Table of Contents