4. INSTALLATION

4.1 Checking of placement

Hose extension
If extended external part is necessary when connecting the drain hose, the length of the drain hose should be less
than 3 m and the height should be below 10 cm.
Install the machine 10 cm or more away from the wall.
Water Supply
Hose
Below 10 cm
3 m max.
Connect the water supply hose
to the water supply valve screw.
Nut
1. Push the water supply hose nut straights onto
the water supply valve screw.
2. Hold the elbow by lifting it up, screw the nut
onto the water supply valve screw, and firmly
tighten the nut.
3. After the nut is tightened, check whether or
not the elbow is unsteady or loose.
4. After tightening, open the faucet to confirm
that there is no water leakage.
[Cautions]
Drain hose
Firmly tighten the nut, otherwise water leakage
will result.
Water Pressure Rating :
4
2.9 x 10 ~ 9.8 x 10 Pa
Good Example
– 7 –
Elbow
Water supply
valve screw
5
Do not put hose tip
under the water
Over 10 cm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Na-f70b2Na-f72b2Na-f852bNa-f902b

Table of Contents