For All Boilers Flushing To Bs.7593; Inhibitor; Water Treatment - IDEAL icos HE12 Installation And Servicing

Hide thumbs Also See for icos HE12:
Table of Contents

Advertisement

back
8
SEALED SYSTEM REQUIREMENTS - continued
Safety valve setting
Vessel charge and initial
system pressure
Total water content of system
litres
25
50
75
100
125
150
175
200
225
250
275
300
Multiplying factors for
other system volumes
9

WATER TREATMENT

The icos boiler range have an ALUMINIUM alloy heat exchanger
IMPORTANT.
The application of any other treatment to this product may render the guarantee of Ideal
Stelrad Group invalid.
Ideal Stelrad Group
recommend water treatment in accordance with the Benchmark Guidance Notes on Water
Treatment in Central Heating systems.
Ideal Stelrad Group
recommend the use of FERNOX-COPAL or MB1 or GE Betz Sentinel X100 inhibitors and
associated water treatment, which must be used in accordance with the manufacturers' instructions. For further
information contact:
Fernox Manufacturing Co. Ltd
Cookson Electronics
Forsyth Road
Sheerwater
Woking
Surrey
GU21 5RZ
Tel: +44 (0) 1799 521133
Notes
1. It is most important that the correct concentration of the water
treatment product is maintained in accordance with the
manufacturers' instructions.
2. If the boiler is installed in an existing system any unsuitable
additives MUST be removed by thorough cleansing.
BS. 7593:2006 details the steps necessary to clean a
domestic central heating system.
icos -
Installation & Servicing
GENERAL
3.0 bar
0.5
1.0
1.5
bar
bar
bar
2.1
2.7
3.9
4.2
5.4
7.8
6.3
8.2
11.7
8.3
10.9
15.6
10.4
13.6
19.5
12.5
16.3
23.4
14.6
19.1
27.3
16.7
21.8
31.2
18.7
24.5
35.1
20.8
27.2
39.0
22.9
30.0
42.9
25.0
32.7
46.8
0.0833
0.109
0.156
Sentinel Performance Solutions
The Heath Business & Technical Park
Runcorn
Cheshire
WA7 4QX
Tel: 0800 389 4670
www.sentinel-solutions.net
2.5 bar
0.5
1.0
bar
bar
Expansion vessel volume litres
2.3
3.3
4.7
6.7
7.0
10.0
9.4
13.4
11.7
16.7
14.1
20.1
16.4
23.4
18.8
26.8
21.1
30.1
23.5
33.5
25.8
36.8
28.2
40.2
0.094
0.134
Salamander Engineering Ltd
The Heath Business &
Technical Park
Runcorn
Cheshire
WA7 4QX
Tel: +44 (0) 121 3780952
3. In hard water areas, treatment to prevent lime scale
may be necessary - however, the use of artificially
softened water is NOT permitted.
4. Under no circumstances should the boiler be fired
before the system has been thoroughly flushed.
2.0 bar
1.5
0.5
1.0
bar
bar
bar
5.9
2.8
5.0
11.8
5.6
10.0
17.7
8.4
15.0
23.7
11.3
20.0
29.6
14.1
25.0
35.5
16.9
30.0
41.4
19.7
35.0
47.4
22.6
40.0
53.3
25.4
45.0
59.2
28.2
50.0
65.1
31.0
55.0
71.1
33.9
60.0
0.237
0.113
0.20
13