Installation And Operation; Transportation And Installation; Installation Procedure; Table 3.1 How To Transport And Install The System - Mitsubishi Electric 2033D SERIES Owner Technical Manual

Mitsubishi power supply owner's manual
Table of Contents

Advertisement

MITSUBISHI
ELECTRIC

3.0 INSTALLATION AND OPERATION

3.1 Transportation and Installation

TABLE 3.1 How to transport and install the system

Transportation
Transport unit with forklift.
Carry with overhead crane using
eyebolts provided.
Do not transport in a horizontal position. Cabinets must be maintained
Note :
upright within +/- 15° of the vertical during handling

3.2 Installation Procedure

A) Note the load tolerance of the floor
Refer to Table 3.2 for list of UPS weights.
TABLE 3.2 List of UPS weights
UPS Capacity (kVA)
Weight (lb)
B) Minimum clearance required for ventilation
Right side
Left side
Back side
Top side
C) Space requirement for routine maintenance
Allow for the following space at the time of installation.
Front
Sides
Rear
2033D SERIES UPS
OWNERS / TECHNICAL MANUAL
30
2060
1.0" (25 mm) (not required when sidecars are used)
1.0" (25 mm) (not required when sidecars are used)
0.0" (0.0 mm)
23.6" (600 mm) (for air flow)
39.4" (1000 mm)
0.0" (0.0 mm)
0.0" (0.0 mm)
MITSUBISHI ELECTRIC 2033D SERIES UPS
Installation
Using the pre drilled holes (4 - 24) in the
UPS channel base, anchor the unit using
appropriate hardware. (Not provided)
.
50
80
1810
1990
Page Number:
3-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents