Spitwater G120 Operating Instructions Manual

Spitwater G120 Operating Instructions Manual

High pressure cold water

Advertisement

G120
G120+
Original instruction

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the G120 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Spitwater G120

  • Page 1 G120 G120+ Original instruction...
  • Page 3: Main Components

    MAIN COMPONENTS Fig. G120 ° F 0 ° C . 6 G I T A L / m °F 0 °C .6 G IT A L /m Fig. G120+ ° F 0 ° C . 6 G I T A L / m °F...
  • Page 4 Fig. Fig. G120+ Click Fig. Fig. Fig. Fig. G120 G120+...
  • Page 5 Fig. Fig. Fig. Fig. Fig. Fig.
  • Page 6 Fig. Fig. Fig. Fig. G120 G120+ Fig. Fig. G120 G120+...
  • Page 7 Fig. Fig. G120+...
  • Page 8 G120 G120+ 110 bar 110 bar -Working pressure 11 MPa 11 MPa 120 bar 120 bar -Max.permissible pressure 12 MPa 12 MPa 450 l/h 450 l/h -Water throughput Maximum 7,5 l/min 7,5 l/min -Voltage 230V-240V* 230V-240V* -Frequency 50Hz 50Hz 2,7 kW...
  • Page 9: Safety Precautions

    MAIN COMPONENTS electric socket, check that the electric data corresponds to that of the power supply network printed on the identity plate. G120 - G120+ (Fig. 1-2) Carefully read the user instruc- 1) Power plug tions before starting the machine 2) Main switch for the first time.
  • Page 10: Clothing And Equipment

    The electrical system to which the appliance is con- bled individuals (including all children). It is also not nected must be realized in compliance with the laws intended for use by individuals without any knowledge, of the country of installation. experience or operation skills on the device, unless said Whenever extension cables are used, the individuals haven’t first been monitored by a person put...
  • Page 11 ElECTrICAl CONNECTION Of THE Fit handle to hose reel using supplied screw (Fig. 4 APPlIANCE Only for G120+). The mains voltage must match the operating voltage. (See identification plate) - Insert the plug into a power socket installed in compliance with regulations.
  • Page 12: Switching Off The Machine

    Operate the equipment in vertical position cleaned. (fig.11) only after connecting the water Fill the detergent tank (1-Fig. 17- G120 - 1- Fig. supply pipe and turning on the tap. 18 - G120+) with detergent, dilute as recommended. - Start the water cleaner with the ON/OFF switch in The tank(s) can be removed to aid filling and emptying.
  • Page 13: Troubleshooting

    STOrAGE Treatment of waste from electric/electronic equipment Store the appliance in premises protected against freezing conditions. Dispose of the product in accordance with current If freeze protection is not guaranteed, suction a glycol regulations concerning differentiated waste disposal based anti-freeze into the pump, as for cars in dedicated waste disposal areas.
  • Page 14 SPITWATEr AuSTrAlIA PTy lTD 953 METRY STREET, ALBURY, NSW 2640, AUSTRALIA EC CONFORMITY DECLARATION PRODUCT: High pressure cold water powerwasher G120 - G120+ MODEL: DECLARATION: The device has been constructed in accordance with the following directives: EC machine directive 98/37/EEC...
  • Page 16 SPITWATEr AuSTrAlIA PTy lTD 953 METry STrEET, AlBury, NSW 2640, AuSTrAlIA...

This manual is also suitable for:

G120+

Table of Contents