Configuring Option Cards - GE Multilin EPM 7000 Quick Start Manual

Power quality meter
Table of Contents

Advertisement

CHAPTER 1: USING THE I/O OPTION CARDS
1.3

Configuring Option Cards

MULTILIN EPM 7000 - POWER QUALITY METER – QUICK START GUIDE
• Make sure the I/O card is inserted properly into the track to avoid damaging
the card's components.
• For proper card fit, and to avoid damaging the unit, insert components in the
following order:
Option Card 1
Option Card 2
Detachable terminal block 1
Detachable terminal block 2
Communication connection for Port 2
FOR PROPER OPERATION, RESET ALL PARAMETERS IN THE UNIT AFTER HARDWARE
MODIFICATION.
The EPM 7000 meter auto-detects any Option cards installed in it. You configure the Option
cards through GE Communicator software. Refer to Chapter 6 of the GE Communicator
User Manual for detailed instructions.
1–3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Multilin EPM 7000 and is the answer not in the manual?

Questions and answers

Table of Contents