Commissioning
Overview
This section addresses initial power up (or commissioning) of
an Observer® Control. The wall control will communicate
and identify all communicating components in the system.
When the Observer Wall Control is first powered up, it will
display, Loading Graphics, then Select Function of this Unit.
Next it will search for equipment, beginning with the indoor,
then the outdoor, and remote room sensors.
When the control powers up, it will display loading graphics,
and will ask the Installer to select the function of this control..
The wall control indicates that it is now "FINDING INDOOR
EQUIPMENT", followed by "FINDING OUTDOOR
EQUIPMENT"
22
616 01 1019 00