Asus GigaX 1124 Quick Installation Manual page 5

Asus gigax 1124 quick installation guide
Table of Contents

Advertisement

Table 3
LED indications in VCT mode
LED
Color
3
SYSTEM
Green
Red
4
1 – 24
STATUS
Green
5
(Port Select)
6
SPEED
Green
(Pairs 1, 3)
Amber
DUPLEX
Green
7
(Pairs 2, 4)
Amber
NOTE. The number of lighted LEDs on Pairs 1 ~ 4 shows the distance
from the switch to the defective point (1 LED = 10 meters).
ASUS GigaX 1124
Status Description
On
The switch is on.
On
The switch is initializing or VCT is in
progress.
Off
The switch is off.
Port numbers
On
The port is selected to execute VCT.
Blinking VCT on the port is in progress.
Off
The port is not selected.
On
The pair is shorted.
On
The pair is open (the cable is not attached
to any device).
Blinking The port failed to execute VCT.
Off
VCT is in progress (PORT SELECT LED
is blinking)
OR
No error is found (PORT SELECT LED
is green)
On
The pair is shorted.
On
The pair is open (the cable is not attached
to any device).
Blinking The port failed to execute VCT.
Off
VCT is in progress (PORT SELECT LED
is blinking).
OR
No error is found (PORT SELECT LED
is green).
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents