Download Print this page

Miele DA 270 Operating And Installation Instructions page 31

Ventilation system

Advertisement

^ Bolt the flange firmly to the ceiling
using the four M6 nuts.
^ Shorten the power cord as much as
possible and attach it to the terminal
block inside the chimney. See
"Electrical data".
Before making the electrical connec-
tion read the "Important Safety
Instructions" and "Electrical data"
sections.
^ Finally, being careful not to scratch
the chimney, push the cover plate up
until the spring fixing clips click into
place. If installed correctly, the cover
should be secure and flush against
the ceiling.
^ Before using the appliance remove
the grease filter and remove the
protective foil from the filter frame.
Reseat the filter.
31

Advertisement

loading