Keep this manual in a safe place for future reference. Read this manual carefully be- Burner Installation ................7 fore starting to use your BeQuem 50 pellet burner. The output of the pellet burner Start-up in Off mode................8 depends on how much pellets can be fed into and burned in the combustion head du- Start-up in Operating mode ............8...
14. Supply (230 V) 5. Top coupling 15. To screw feeder 6. Level monitor, transmitter 16. To control sensor 7. Fan 1 and 2 17. Chain 8. Auger tube 9. Burn pot skrews ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 3/20...
In the furnace there must be a sufficient under-pressure, (“natural draft”), which allows burning of the pellets efficiently. As a guide value approx. 30 Pascal is suitable. Burner auger ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 4/20...
INSTALLATION Good planning saves time. Ensure immediately upon delivery from Ariterm that eve- ELECTRICAL INSTALLATION rything is included and undamaged. If possible plan in advance for on-site assembly. The supply cable delivered with burner is connected to the burner. In addition, an...
It is a good idea to lubricate the guide arms. withdrawn from the boiler. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 7/20...
Note! When the burner is switched on at the first time or, for some reason, it does not contain any pellets, a restart is sometimes required approx. after a 3 minutes’ running time. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 8/20...
Adjustment is made with a flue gas analyser and should be burner) ignition element can be found. carried out by a service technician authorised by Ariterm. Flue gas analysis shall be Browsing forward in the menu AUGER EXTERNAL FAN 2...
“forward” to the next screen, if you want to view the pellets store data. Displays the number of operating days at the avera- Estimated time left For information only. ge consumption level in question. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 10/20...
Page 11
Is reset by pressing the Plus/Minus buttons si- Default set vXXXX les resetting the factory settings. the Plus button. Cold starts Displays the number of cold starts. multaneously for 3 seconds. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 11/20...
ACTIONS CHART ACTIONS CHART Biomatic+ 50 / BeQuem 50 version 0906 OPERATING TIME OPERATING TIME OPERATING TIME OPERATING TIME OPERATING TIME TOTAL EL 2 EL 1 ESTIMATED TIME PELLETS STORE FEEDING FAKTOR CONSUMPTION AUGER EXTERNAL ALARM PELLETS CONSUMPTION MIN 0,0 t...
The feed opening of fuel must be loca- have been stuck in the silo. ted in the middle of the fuel store (app- lies to small week stores). ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 13/20...
No and, when necessary, should be repla- fuel has entered into the combus- ced by an authorised technician. tion head. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 14/20...
These maintenance measures should be carried out at frequent intervals. Close the inlet of combustion air into the boiler room. Put out the fire using a fire extinguisher. Make a fire alarm, as necessary. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 15/20...
Clean the flame controller metal pipe so that the ash in the pipe will not hinder the operation of the flame control sensor. The condition of the burner head wheels must be checked during maintenance. ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 16/20...
Diameter of the pellet is 6 to 12 mm and length 10 to 30 mm. Due to the small size This burner manufactured by Ariterm AB is guaranteed to be free of defects in work- the pellets move freely in the feed augers.
Inst. date If these instructions are not followed during installation, operation and maintenance, the obligations of Ariterm AB under the warranty regulations are no longer binding. Ariterm reserves the right to alter any details and specifications without prior notice. ARITERM SWEDEN AB Installation, Operation &...
Page 20
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18- 20/20...