EarthQuake W1265V Operator's Manual page 14

Trail warrior quick split 12-ton log splitter
Table of Contents

Advertisement

4. Mount ram/beam assembly onto uprights using 82mm
bolts. Tighten, but do not over tighten the lock nut as the
ram/beam assembly will use the bolt as a hinge.
Note: Holes in rear upright are elongated to assist in lining
up the upright holes during assembly. Tighten these fas-
teners securely. SEE FIGURE 5.
5. Place wheel onto axle, valve stem out. Place washer onto
axle and secure with snap ring. Repeat for the other axle. SEE
FIGURE 6.
6. Attach engine assembly with (1) each of 70mm bolt and
25mm bolt to axle assembly. Tighten locknuts using 13mm
wrenches.
7. (U.S. Version) Slide ram assembly to rear bracket and attach
with (4) 20mm bolts, locknuts and (2) retainer plates. SEE FIG-
URES 7 aND 8.
Figure 5
14
Figure 6
Figure 7
Figure 8
Check for parts online at www.getearthquake.com or call 800-345-6007 M-F 8-5
Trail Warrior Quick Split 12-Ton Log Splitters
Operator's Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

W1265bW1265cvW1265vceW1265bce

Table of Contents