Download Print this page

Packing Of The Set - Sharp mz-1d04 Service Manual

Green monitor

Advertisement

Safety check-out at the time of servicing
1. Servicing must always be reliable.
(l)
Use the specified item to replace any component
parts. (Fuse, AC cord, high tension parts, power
supply parts, internal wiring, and high tension lead
wire)
(2) Check to see that everything have been set on their
original position, including wirings.
Parts location, space, wire shape, soldered condition
(such as jutted solder, excessive solder, tunnel, etc.).
Insulation materials (such as tape, tube, PVC sheet
treatment).
2. Safety check-out even after
servicing
(1) Remove dust, then check intrusion of any alien object
such as solder fragments and cloth fragments.
(2) Test insulation using the ohmmeter. (Between both
terminals of the AC plug and metal exposed section of
the DIN terminal)
3. About
high
voltage circuit
Since the high voltage sections have been set to their
rated values before the machine left the factory, never try
to change high voltage value. Impression of unnecessary
high voltaged may cause to emit X-ray or discharge corona.
9. PACKING OF THE SET
Setting Position of the knobs
POWER . . . . • • . • . . • . . . . OFF
V·HOLD. • . . . • . . . . • . NORMAL
BRIGHT . . . . . . . . . . . . . . . BEST
Buffer
material
ACcord
Set cover
Tape -_-IL--::&i;;:;;:-:
Serial number card -----11----'
14
Instruction
manual
Tape
- f > - - - - - - - Packing case
Card sack

Advertisement

loading