Gas Requirements - LG DLE0332 Installation Instructions Manual

Table of Contents

Advertisement

GAS REQUIREMENTS

Gas Dryers
NOTE : The gas service to a gas dryer must conform
with the local codes and ordinances or, in the absence
of local codes and ordinances, with the latest edition
of the National Fuel Gas Code ANSI Z223.1/NFPA
54 or the CAN/CGA-B149, National Gas Installation
Code.
L.P (Liquefied Petroleum) Gas, 2,500 Btu/ft
MJ/m
3
), service must be supplied at 8~13 in. water
column pressure.
NOTE : DO NOT connect the dryer to L.P. Gas
Service without converting the gas valve.
L.P. gas conversion:
- Conversion must be made by a qualified technician.
See gas valve burner base for gas conversion kit part
number.
NOTE : When connecting to a gas line, an equipment
shutoff valve must be installed within 6 feet (1.8m) of
the dryer. An 1/8 in. N.P.T. pipe plug must be
installed as shown. Refer to Fig.1
Supply line requirements:
Provide a rigid gas supply line to the dryer location.
- An individual manual shutoff valve must be installed
within 1.8m (6 feet) of the dryer in accordance with the
National Fuel Gas Code ANSI Z223.1*.
1 8
When a rigid pipe is used it should be 1/2 inch IPS.
When acceptable to the gas supplier and local codes, 3/8-
inch approved tubing may be used for lengths under 6.1
m (20 feet). For lengths over 6.1m (20 feet), larger
tubing should be used. Pipe-joint compounds resistant to
the action of L.P. gas must be used.
3
(93.1
To reduce the risk of gas leaks, fire or
explosion:
• The dryer must be connected to the
• Use a new flexible stainless steel
• Use pipe joint compound insoluble in
• Purge air and sediment from gas supply
• Do not use an open flame to check for
• Any dis-assembly requiring the use of
WARNING
type of gas as shown on the nameplate
located in the door recess.
connector.
L.P. (Liquefied Petroleum) Gas, or
Teflon tape, on all pipe threads.
line before connecting it to the dryer.
Before tightening the connection, purge
remaining air from gas line to dryer
until odor of gas is detected. This step
is required to prevent a gas valve
contamination.
gas leaks. Use a non-corrosive leak
detection fluid.
tools must be performed by an
authorized qualified service person.

Advertisement

Table of Contents
loading

Table of Contents