Boiler
Rails and Front Panels
Combustion Air Flex Hose
16
Vitocrossal 200 CM2 186 to 311 Installation
1. Install mounting rails to bottom of boiler frame using
M6 x 10 screws.
2. Install mounting rails to top of boiler frame using
M6 x 10 screws.
3. Install bottom panel to front of boiler frame using M6
screws. (Be careful not to move mounting rails).
4. Install front control panel (top) and secure with 4.8
metal screws.
Legend
A Rating Plate
1. Install support bracket for flex hose to bottom panel
using two M4 x 10 screws, nuts and washers.
2. Attach the flex hose
7
hose adaptor and secure the flex hose to the flex hose
adaptor with the retaining clamp.
3. Secure the flex hose to the support bracket with the
retaining clamp.
Note: Do not squeeze hose when securing it with the
retaining clamp.
6 in. (150 mm) to the flex