Continuous Air Barrier Systems - Marvin Window User Manual

Marvin window user manual
Table of Contents

Advertisement

Continuous Air Barrier Systems − Preparing the Opening
The method shown below is Method A1 using a TYPE III flash pan. For step by step instructions on how to prepare
an opening using this method, refer to
Flashing Method A1−Membrane Drainage System". Refer to ASTM E2112−07 for other rough opening preparations
that are more appropriate for your situation.
Figure 14: Preparing the opening.
19970019
2012−04−10
www.marvin.com/ROprep
12
for instructions "Window Rough Opening Prep and
StormPlus and Structural Installations
Window Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents