Check Venter Static Pressure - UTICA BOILERS USC Installation Manual And Operating Instructions

Direct vent gas fired boilers for forced hot water
Table of Contents

Advertisement

CHECK
CHECK
CHECK VENTER ST
VENTER ST
VENTER ST
VENTER STA A A A A TIC PRESSURE
CHECK
CHECK
VENTER ST
(Refer to figure 18 below for the following instructions.)
1. With the boiler off, disconnect the orange and white tubings from the pressure switch
on the air box and venter motor.
2. Install a 3/16" (.48 cm) plastic barbed tee between a slope manometer and the
pressure switch. (
Additional tubing is required.) If the tubing is cut, replace it only with O.E.M. high
temperature silicone tubing.
or plastic tubing because it will melt.
3. The other part of the tee goes to the air box and venter pressure taps.
A. Orange being the high negative.
B. White being the low negative.
4. Turn the boiler back on and read the static pressure. The reading should be -
.55±.05 inches water column or higher for the USC series boilers.
5. If the static pressures are not at the minimum allowable level, check the intake and
exhaust pipes for obstructions or damage.
6. To reassemble, remove the tees and additional tubing and replace the orange tube
to the venter tap, and the white tube to the air box tap.
TIC PRESSURE
TIC PRESSURE AS FOLL
TIC PRESSURE
TIC PRESSURE
CAUTION
CAUTION
CAUTION: : : : :
CAUTION
CAUTION
CAUTION: : : : :
CAUTION
CAUTION
CAUTION
CAUTION
FIGURE 18
PAGE 16
AS FOLLO O O O O WS:
AS FOLL
AS FOLL
AS FOLL
Do not cut original tubing.
Do not replace with vinyl
WS:
WS:
WS:
WS:

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents