●
Screw the earth cable from the sewing head and the main switch to earth point A.
●
Connect earth point A to earth point B with earth cable.
●
Insert plug 3 from the adapter cable to bush X 2.
●
Connect the motor to the "Motor" plug and the synchronizer to the "Extern" plug.
●
Fasten the earth cable from plug X1 to earth point B.
Installation and commissioning
23