Console Port; Verify Installation; Power On - TP-Link TL-SG3210 Installation Manual

L2 managed switch
Hide thumbs Also See for TL-SG3210:
Table of Contents

Advertisement

L2 Managed Switch

4.3 Console Port

4.4 Verify Installation

4.5 Power On

16
Connection
CLI (Command Line Interface) enables you to manage the switch, thus you can load
the CLI after connecting the PCs or Terminals to the console port on the switch via the
provided cable.
Connect the console port of the device with your computer by the console cable as the
following figure shows.
Figure 4-3 Connecting the Console Port
You can also manage the device through the console port, for details please refer to the
CLI Reference Guide on the resource CD.
Note:
The console port is the first port on the left of the front panel.
Please keep the device power off when plugging the console cable.
Do not connect the console port with other ports by RJ45 cable.
After completing the installation, please verify the following items:
There are 5~10cm of clearance around the sides of the device for ventilation and the
air flow is adequate.
The voltage of the power supply meets the requirement of the input voltage of the
device.
The power socket, device and rack are well grounded.
The device is correctly connected to other network devices.
Plug the female connector of the provided power cord into the power socket of the
device, and the male connector into a power outlet as the following figure shows.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tl-sg3216Tl-sg3424Tl-sg3424p

Table of Contents