Pressure Relief Valve; Filling The System; Testing The Water System - Navien NCB-24LSWE Installation & Operation Manual

Condensing combi boiler
Hide thumbs Also See for NCB-24LSWE:
Table of Contents

Advertisement

3.5 Pressure Relief Valve

The requirements recommended for the pressure relief valve are
as follows:
The pressure relief valve is calibrated to be activated at a
maximum pressure of 3 bar, and all the pipes and connections
must therefore be able to withstand pressures of up to 3 bar.
Connect the pressure relief valve drain to a tube with a
diameter of at least Ø15 mm. It must tilt downwards in
downstream direction throughout its entire length, and the
water must run off to a suitable drain. It must be positioned
so as not to cause damage to cabling, electrical equipment or
persons.
The drain must not be located above a window, entry door or
any other public access point. Bear in mind that boiling water
or steam could come out when draining.

3.6 Filling the system

Before filling the boiler pipes, pull up the air vent cap to allow
the pipes to fill properly. Press the cap back in when the pipes
are full.
Ensure that the vent cap is fitted before testing or
Note
operating the system.
26
Installing the System Piping
Air Vent Cap

3.7 Testing the Water System

WARNING
Ensure that the boiler is full of water before firing the burner.
Operating the unit without filling it will damage the boiler.
Such damage is not covered by the warranty, and may result
in property damage, severe personal injury, or death.
Perform a fill test after installing the boiler's water system to
make sure that the system has been installed properly. Follow
the instructions below to perform a fill test on the water system.
1. Close the manual air vents and the boiler drain valve.
2. Fill the boiler. The correct pressure will vary with each
application.
3. If the pressure is lower than the minimum pressure set (1 bar
by default), error code E02 will appear on the display.
4. Fill the boiler with more water until the error message
disappears.
5. At initial fill and during boiler start-up and testing, check
the system thoroughly for leaks. Repair any leaks before
proceeding further.
WARNING
Eliminate all system leaks. The continual introduction of fresh
makeup water will reduce boiler life. Minerals can build up in
the heat exchanger, reducing heat transfer, overheating the
heat exchanger and causing heat exchanger failure.
CAUTION
Before operating the boiler for the first time, ensure that the
boiler system is filled with water. Purge the air inside the
system to avoid damage to the boiler.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncb-34lsweNcb-28lsweNcb-40lswe

Table of Contents