Further details regarding the individual steps
High flow operation, 40 l/(h·m
Number of
Flow rate in l/min
collectors
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Vitosol 200-F, type 5DIA
Throughput 5 to 6 l/min
Commissioning the system
Close the air vent valve.
Checking the switching function of the solar control unit
Solar control unit installation and
service instructions
Checking and replacing the heat transfer medium if required
■ The heat transfer medium provided is
a liquid based on 1,2-propylene glycol
with a pH value of 9.0 to 10.5 and frost
protection down to -28 °C.
■ Have the condition of the medium
checked as part of the annual service
of the solar thermal system by the
heating contractor.
Commissioning, inspection, maintenance
2
)
Low flow operation, 15 l/(h·m
Number of
collectors
3
6
4.5
7
6
8
7.5
9
9.5
10
10.5
11
12.5
12
14
13
15.5
14
17
15
18.5
16
20
18
21.5
20
23.5
Observe operating instructions of
installed components.
■ The pH value and frost protection tem-
perature can be checked with the
solar service case (accessories).
(cont.)
Flow rate in l/min
Solar service case operating
instructions
2
)
3.5
4
4.5
5
5.5
6.5
7
7.5
8
8.5
9
10.5
11.5
11