Pin On Bale Probe; Assembly Instructions; Installation Instructions To Pin On Quick Attach; Installation Instructions Direct To Loader - Mahindra ML170 series Operator's Manual & Installation Instructions

Table of Contents

Advertisement

11.1. PIN ON BALE PROBE

IMPORTANT: This spear is a high strength alloy – drop forged steel and should not be welded or heat-
treated.
IMPORTANT: Maximum load limit on super penetrator bale spear is 2,000 pounds.

11.2. ASSEMBLY INSTRUCTIONS

11.2.1. Install Bale Spear into tapered sleeve and
secure with nut. Torque nut 515 ft. lb. Failure to
follow these instructions could cause damage to
spear and void your warranty.
(1) Upper Spear.
Flat surface of spear located upward.
(2) Tapered Sleeve.
(3) Upper Spear Nut, 28mm.
Torque nut to 515 ft. lb.

11.3. INSTALLATION INSTRUCTIONS TO PIN ON QUICK ATTACH

IMPORTANT: Refer to Pages 55 to 57 for instructions concerning Installing Attachment to Pin On Quick
Attach.
IMPORTANT: Refer to Page 58 for instructions concerning Removing Attachment from Pin On Quick
Attach.

11.4. INSTALLATION INSTRUCTIONS DIRECT TO LOADER

11.4.1. Install pin on bale spear direct to loader. Secure using pins and e-clips.
Top Pin 1-1/8" x 7.01" and E-Clip, 1 place each side.
Bottom Pin 1-1/8" x 7.01" and E-Clip, 1 place each side.

11.5. OPERATING INSTRUCTIONS

11.5.1. With bale spear level with ground, slowly
spear bale slightly above center.
11.5.2. With all three spears completely engaged into
bale, tilt bale spear slightly back from level and
transport the load in a low position.
(3)
(2)
51
(1)
Spear bale
slightly
above
center of
bale.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents