Hardware installation
4.3.2
Installation in PRIMECENTER/DataCenter Rack
For installation in a PRIMECENTER/DataCenter Rack, the following parts are
required:
– support bracket
– one left and one right telescopic rail (assembled)
– M5x10 screws with integrated plugwashers
I
General information is provided in the Technical Manual for the PRIME-
CENTER and/or DataCenter Rack (see
Fitting the support bracket
When mounting the left telescopic rail in the PRIMECENTER/DataCenter Rack,
the supplied support bracket must first be mounted on the rear left support
upright flush with the bottom edge of the device.
Figure 3: Fitting the support bracket
Ê Position the support bracket at the corresponding height on the rear left
support upright, (insert lug in corresponding hole) (1).
Ê Secure the bracket with two screws incl. plug washers (2).
RX100 S4
Installing/removing the server in/from the rack
1
Operating manual
"Literature" on page
2
77).
39