Removal Of The Air Box; Removal Of The Fan - Biasi RIVA ADVANCE HE M110.24SM/C Service Manual

Wall hung, fan flue, room sealed, high efficiency gas boiler
Hide thumbs Also See for RIVA ADVANCE HE M110.24SM/C:
Table of Contents

Advertisement

the appropriate chapter Maintenance of the
installation instructions manual.
17.3

Removal of the Air box

Warning: isolate the boiler from the mains
electricity supply before removing any
covering or component.
1
Carry out the operations 1 to 6 of section 17.2.
2
Unscrew the screws K and remove the gas con-
nection L (Fig. 17.5).
3
Open the strip M by sliding the edges with the
help of a screwdriver and remove the Air box
4
Assemble the Air box carrying out the removal
operations in reverse sequence.
M
Fig. 17.5
Warning: After cleaning or replacement as
detailed above, if it deemed necessary to
undertake a combustion analysis, refer to
the appropriate chapter Maintenance of the
installation instructions manual.
G.
G
K
L
17.4

Removal of the Fan

Warning: isolate the boiler from the mains
electricity supply before removing any
covering or component.
1
Remove the fan group (see section 17.2).
Unscrew the screws N (Fig. 17.6).
2
3
Assemble the Fan carrying out the removal oper-
ations in reverse sequence.
Before reassembling ensure the fan gasket is cor-
rectly mounted.
Warning: After cleaning or replacement as
detailed above, if it deemed necessary to
undertake a combustion analysis, refer to
the appropriate chapter Maintenance of the
installation instructions manual.
N
Fig. 17.6
Fan and Air box
Fan gasket
35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Riva advance he m110.32sm/c

Table of Contents