Equipment Checklist; Mounting - KTI Networks KGS-2800 Installation Manual

Managed 28-port gigabit ethernet switch with 24 sfp ports and 4 10g sfp+ ports
Table of Contents

Advertisement

Figure 7: RJ-45 Connections
EQUIPMENT
CHECKLIST
PACKAGE
CONTENTS

MOUNTING

RACK MOUNTING
After unpacking this switch, please check the contents to be sure
you have received all the components. Then, before beginning
the installation, be sure you have all other necessary installation
equipment.
SW24GF4TG GbE Fiber Managed Switch
Four adhesive rubber feet
Mounting Accessory (for 19" Rack Shelf)
User's Manual CD
AC Power Cord
RS232 DB9 to DB9 Cable
Please notify your sales representative immediately if
N
:
OTE
any of the aforementioned items is missing or damaged.
The mini-GBICs are Class 1 laser devices. Avoid direct
W
:
ARNING
eye exposure to the beam coming from the transmit port.
The switch can be mounted in a standard 19-inch equipment
rack or on a desktop or shelf. Mounting instructions for each
type of site as follow.
Before rack mounting the switch, please pay attention to the
following factors:
Temperature: Since the temperature within a rack assembly
may be higher than the ambient room temperature, check
that the rack-environment temperature is within the
specified operating temperature range (0 to 40 °C).
Mechanical Loading: Do not place any equipment on top of a
rack-mounted unit.
Figure 8: SFP Transceiver
8

Advertisement

Table of Contents
loading

Table of Contents