Yamaha VK10W Supplementary Service Manual page 81

Hide thumbs Also See for VK10W:
Table of Contents

Advertisement

Z Starter cable
[ Brake hose
\ Fuel sender lead coupler
] Fasten the ignition coil lead to
the frame cross member with the
plastic band, making sure to fas-
ten the lead under the fuel hoses
and to face the end of the band
rearward.
^ Fasten the fuel hoses with the
holders.
a Fasten the coolant hoses with
plastic band, making sure that
the end of the band is to the rear
of the hose, facing downward.
b Fasten the coolant hose and
throttle position sensor coupler
with the plastic band, making
sure that the end of the band is
to the rear of the hose, facing
downward.
c Slide the boot completely over
the throttle position sensor cou-
pler, and then fasten the coupler
to the coolant hose with the plas-
tic band.
d Air duct
e When installing the air duct,
make sure that it contacts the
bulkhead.
f Install the ground lead terminal
and the rectifier/regulator using
the same bolt.
g Rectifier/regulator
h Insert the front section of the
cover into the frame.
i Fasten the wire harness at the
white tape with the plastic band.
j To the headlight and meter
assembly
k Install the starter motor lead ter-
minal so that the bent section of
the terminal is facing upward.
l Up
m Front
n Load control relay
o Headlight relay
p Fasten the gear position switch
lead at the positioning tape with
the plastic locking tie.
q Carburetor heater relay
r Back buzzer
s When installing the back buzzer,
make sure that it contacts the
rivet.
t To the tail/brake light
u Nut
v Bolt
w Pass the negative battery leads
under the starter relay.
CABLE ROUTING
75
SPEC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents