Bosch GSR 12 VE-2 Operating Instructions Manual page 9

Cordless screwdriver/combination cordless drill
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
OBJ_BUCH-211-001.book Page 9 Tuesday, September 19, 2006 4:43 PM
Combination Cordless Drill
Article number
Rated voltage
No-load speed
– 1st gear
– 2nd gear
Impact frequency at no-load
Max. torque for hard/soft screwdriving
application according to ISO 5393
Max. screw dia.
Max. drilling dia.
– Steel
– Wood
– Brickwork
Chuck clamping range
Drill spindle
Weight according to EPTA-Procedure
01/2003
Technical data determined with 2.6 Ah NiMH HD battery.
Please observe the article number on the type plate of your power tool. The trade names of individual tools may vary.
Assembly
Battery Charging
A new battery or a battery that has not been used for a
longer time produces full power only after approxi-
mately five charge/discharge cycles.
To remove the battery 8, press the unlocking buttons 7
and pull out the battery downwards. Do not exert any
force.
The battery is equipped with an NTC temperature con-
trol which allows charging only within a temperature
range of between 0 °C and 45 °C. A long battery ser-
vice life is achieved in this manner.
A significantly reduced working period after charging
indicates that the battery is used and must be replaced.
Observe the notes for disposal.
Auxiliary Handle (GSR 18 VE-2 /
GSB 18 VE-2) (see figure A)
Operate your power tool only with the auxil-
iary handle 6.
The auxiliary handle 6 can be set to any position for a
secure and low-fatigue working posture.
Turn the bottom part of the auxiliary handle 6 in counter-
clockwise direction and swivel the auxiliary handle 6 to
the desired position. Then retighten the bottom part of
the auxiliary handle 6 by turning in clockwise direction.
The clamping band 12 of the auxiliary handle must be
seated in the corresponding groove.
2 609 932 518 • 19.9.06
GSB 12 VE-2
PROFESSIONAL
3 601 J94 K..
V=
12
rpm
0–450
rpm
0–1850
bpm
28000
Nm
60/26
mm
8
mm
13
mm
35
mm
13
mm
1.5–13
½"
kg
2.7
Changing the Tool (see figure B)
Before any work on the power tool (e. g.,
maintenance, tool change, etc.) as well as
during transport and storage, set the rota-
tional direction switch to the center position.
Unintentional actuation of the On/Off switch can
lead to injuries.
The drill spindle is locked when the On/Off switch 11
is not pressed. This makes quick, convenient and easy
changing of the tool in the drill chuck possible.
Open the keyless chuck 1 by turning until the tool can
be inserted. Insert the tool.
Firmly tighten the collar of the keyless chuck 1 by hand
in clockwise direction until the locking action ("click") is
no longer heard. This automatically locks the drill
chuck.
The locking is released again to remove the tool when
the collar is turned in the opposite direction.
Replacing the Drill Chuck
(see figures E–G)
Before any work on the power tool (e. g.,
maintenance, tool change, etc.) as well as
during transport and storage, set the rota-
tional direction switch to the center position.
Unintentional actuation of the On/Off switch can
lead to injuries.
GSB 14,4 VE-2
GSB 18 VE-2
PROFESSIONAL
PROFESSIONAL
3 601 J94 H..
3 601 J94 F..
14.4
0–470
0–1950
29000
65/28
10
13
40
14
1.5–13
½"
2.8
18
0–500
0–2050
31000
75/36
10
13
45
16
1.5–13
½"
3.0
English | 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents