Roto-Peen Assembly - Smith SPS8 User Manual & Parts List

The surface preparator
Table of Contents

Advertisement

ILL# P/N
1
65060
2
25060
3
65067
4
65068
5
10451
6
10871
7
65065
8
25022
1. Install the flap on every other slot with the side with printing (front) facing the direction
of rotation.
2. Spacer rings facing the hub must be opposite each other and offset flap loading by 1/4".
3. Set the center point of the drum 3-3/8" above the work surface.
4. Recommended RPM is 1725.
5. Hook up a dust system to the vacuum port to keep the flaps clean and cool.
1/2009
ROTO-PEEN ASSEMBLY (optional)
an alternative to shot blasting
Qty
Description
1
Rotopeen hub (1-8)
2
Ring Spacer
1
End Cap
1
Driver Flange
6
Washer, Internal 1/4
6
Screw, 1/4-20 X 1
20
Keeper Pin
35
Type D-2" (1/2 loading)
Spacer Ring
Position
Be sure to position
"long studs" on spacer
ring #1 opposite "open
space" on spacer
ring #2.
Hub
SMITH Manufacturing
3-3/8"
(86mm)
1-954-941-9744
www.SmithMfg.com
SPS8
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents