Release Sheet Replacement; Release Sheet Kit Removal; Troubleshooting; Troubleshooting Guide - APW Wyott VCG Installation And Operating Instructions Manual

Apw / wyott vertical contact bun grill toaster installation and operating instructions model vcg
Table of Contents

Advertisement

Release Sheet Replacement

1
6
1. Turn toaster off.
2. Remove the top cover.
3. Remove old release sheet from the toaster
platen (grill).!!! CAUTION !!! TOASTER
PLATEN MAY BE HOT.
4. If the reverse side of the release sheet is still
good, then fold the release sheet the opposite
way and use the other side. Skip to step 6.
5. If using a new release sheet, fold the release
sheet in half (length-wise) and
6. Turn toaster on. (Conveyors will not run
because top cover is removed.)
Release Sheet Kit
11

6. TROUBLESHOOTING GUIDE

Always ask and check the following:
1.
Is the unit connected to a live power source of the proper voltage?
2.
Check the circuit breaker.
3.
Is power switch "ON" and pilot light glowing?
4.
Check the rating label. Is the unit connected to the correct power
source?
Service Hotline (800) 733-2203
2
7
firmly
crease it.
12
3
8
7. Move the conveyors out full. (The bun thickness
111
dials point straight up.)
8. Drape the release sheet over the toaster platen
and go about 5" down.
9. While holding the release sheet with one hand,
press the conveyor button on top to start the
conveyors. As the conveyors turn, they will
help the release sheet to go down.
CAUTION !!!
10. When the crease reaches the top of the platen,
release the conveyor button.
13
4/5
9/10
BUTTON MAY BE HOT.
11. R e p l a c e t h e t o p
cover to the toaster.
(Conveyor starts to
move.)
12. Let the toaster run
f o r
a b o u t
minutes to warm up
the release sheet.
13. R e - a d j u s t
c o n v e y o r s t o t h e i r
p r o p e r
s e t t i n g s
u s i n g
t h e
thickness dials.
Removing Release Sheet
!!!
3 0
t h e
b u n

Advertisement

Table of Contents
loading

Table of Contents