Integrated Antenna Model Suspended Ceiling T-Bar Mount; Suspended Ceiling T-Bar Mount Procedure - Motorola AP6522E Installation Manual

Table of Contents

Advertisement

Installation Guide

2.5 Integrated Antenna Model Suspended Ceiling T-Bar Mount

Ceiling mount requires holding the AP-6522E Access Point up against a T-bar of a suspended ceiling grid and
twisting the case onto the T-bar.

2.5.1 Suspended Ceiling T-Bar Mount Procedure

1. If required, install and attach a Kensington security cable (customer supplied) to the unit's lock port.
2. Attach an Ethernet cable from the Access Point to a controller with an 802.3af compatible power source
or use the PWRS-14000-148R power supply to supply power to the AP-6522E (once fully cabled).
3. Align the bottom of the T-bar with the back of the case.
4. Orient the case by its length, and the length of the T-bar.
5. Rotate the case 45 degrees clockwise, or about 10 o'clock.
6. Push the back of the case onto the bottom of the T-bar.
7. Rotate the case 45 degrees counter-clockwise. The clips click as they fasten to the T-bar.
8. Verify the unit has power by observing the LEDs.
CAUTION
If not using a 802.3af capable controller to power the AP-6522E,
ensure only the AP-6522E's designated power supply
(PWRS-14000-148R) is used to supply power to the Access Point.
Using an incorrectly rated power supply could damage the unit and
void the product warranty. Do not actually connect to the power
source until the cabling portion of the installation is complete.
13

Advertisement

Table of Contents
loading

Table of Contents