OPERATION

AC PARALLEL OPERATION

Before connecting an appliance to either generator, make sure that it is
in good working order and that its electrical rating does not exceed
that of the receptacle.
Most motorized appliances require more than their electrical rating for
startup. When an electric motor is started, the overload indicator (red)
may come on. This is normal if the overload indicator (red) goes off
within 4 seconds. If the overload indicator (red) stays on, consult your
generator dealer.
During parallel operation, the Eco-Throttle switch should be in the
same position on both generators.
1.
Connect the parallel operation cables (optional equipment) between
the two EU1000i generators following the instructions supplied with
the parallel operation cables.
2.
Start the engines (see page
(green) on each generator comes on (see page
30
22
) and make sure the output indicator
PARALLEL OPERATION CABLES