Installation and commissioning
8
Mounting the upper V-belt guard
.01.05
8
Fitting the synchronizer
.01.06
22
1
4
Fig. 8 - 05
1
2
Fig. 8 - 06
Keystone Sewing Machine Company, Inc.
3
●
Screw position stop 2 to the belt guard
section 3.
●
Attach belt guard section 3.
2
●
Attach belt guard section 4.
●
Push synchronizer 1 onto the shaft so
that stop 2 is standing in the slot on the
synchronizer (see arrow)
●
Tighten screws 3.
●
Connect the synchronizer plug to the
control box.
●
Connect the synchronizer plug to the ad-
apter (see Chapter 8.02 Connecting the
3
plug connections and earth
●
Adjust the synchronizer, see Chapter
8.05 Basic position of the machine.
If a large balance wheel is
used, the corner 1 of the belt
guard 3 must be broken out.
cables).