Commissioning; Switching The Machine On/Off - Pfaff 1245 Instruction Manual

Hide thumbs Also See for 1245:
Table of Contents

Advertisement

8

Commissioning

.03
Fig. 8 - 10
Connect the machine to the compressed air supply. When it is connected, the gauge
should show a pressure of approx. 6 bar. If necessary, have this reading correctly set
(see Chapter 10.08, Checking/adjusting the air pressure).
8

Switching the machine on/off

.04
Switch the machine on (see Chapter 7.01, On/off switch).
2
Do not operate the machine if there is any discrepancy.
Before commissioning the machine, have specialized personnel check whether
the parameter 799 (machine class) is set at "2" and the parameter 800 (sewing
direction) is set at "1". If necessary, have the adjustment carried out (see Chap-
ter 8.05 Basic position of the machine drive unit).
.
The machine may only be connected to an earthed socket!
Keystone Sewing Machine Company, Inc.
Installation and commissioning
Check the machine, particularly its
1
electrical wiring and pneumatic tube
connections, for any damage.
Remove pin 1 of the oil reservoir 2
(Fig. 8 - 10). The pin serves only to
protect the machine from damage during
transport and must not be used when
sewing.
Clean the machine thoroughly and oil it
(see chapter 10 Care and maintenance).
Have skilled personnel check if the ma-
chine can be operated with the available
mains voltage.
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

1246

Table of Contents