Boiler Set-Up And Location; Combustion Chamber Insert - Viessmann Vitorond 100 VR1 Series Installation And Service Instructions Manual

Oil-fired boiler heating input 91 to 140 mbh 27 to 41 kw
Table of Contents

Advertisement

Set-up

Boiler Set-up and Location

Combustion Chamber Insert

14
Vitorond 100, VR1-22 to -33 Installation and Service
IMPORTANT
For important information concerning boiler placement
and set-up, refer to the section entitled "Mechanical
Room" on page 10.
The boiler should be located as close to the chimney as
possible. Set-up/locate boiler with slight incline towards
the rear of the boiler using levelling bolts A.
CAUTION
Boiler must be installed in such a way that oil ignition
system components are protected from water (spraying,
splashing, etc) during boiler system operation and service.
For optimum, environmentally sound operation, Vitorond
boilers are equipped with a high-grade, corrosion resistant,
stainless steel combustion chamber insert.
Ensure the bolts of the combustion chamber door are
tightened before installing the burner.
Combustion chamber insert sizes
Boiler model No.
a
in.
(mm)
b
in.
(mm)
VR1-22
VR1-27
VR1-33
9f
9f
(244)
(244)
(244)
9
9
(231)
(231)
(231)
9f
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents