Download Print this page

Final Preparation - Desa PC-BVBN Installation Instructions

Natural gas to propane/lp gas conversion kit

Advertisement

FINAL PREPARATION

1. Replace logs and embers back into the
correct positions as instructed in your
appliance Owner's Manual.
2. Reinstall glass door and stove front
panel on fireplace. To do so, reverse the
instructions under Removing Glass
Door on page 1.
3. Reinstall stove dropped bottom on fire-
place. To do so, reverse the instructions
under Removing Stove Dropped Bottom
on page 2.
The conversion is now complete.
Refer to the section on Checking Gas Con-
nections and Operating Fireplace in your
appliance Owner's Manual.
55870
WARNING: Test all gas pip-
ing and connections for leaks
after installing or servicing. Cor-
rect leaks at once.
WARNING: Never use an open
flame to check for a leak. Apply
commercial leak test solution to
all gas joints. Bubbles forming
show a leak. Correct all leaks at
once.
INTERNATIONAL
2701 Industrial Drive
Bowling Green, KY 42101
www.desatech.com
105815 01
NOT A UPC
WARNING: This conversion
kit shall be installed by a quali-
fied service agency in accordance
with the manufacturer's instruc-
tions and all applicable codes
and requirements of the author-
ity having jurisdiction. If the in-
formation in these instruction is
not followed exactly, a fire, ex-
plosion, or production of carbon
monoxide may result causing
property damage, personal injury,
or loss of life. The qualified ser-
vice agency is responsible for
the proper installation of this kit.
The installation is not proper and
complete until the operation of
the converted appliance is
checked as specified in the
manufacturer's instructions sup-
plied with the kit.
105815-01
REV. A
09/99

Advertisement

loading