Download Print this page

Final Preparation - Desa PCBM-325 Installation Instructions Manual

Conversion kit from natural gas to propane/lp gas

Advertisement

FINAl PrePArATION

1. Replace any vermiculite and ember mate-
rial if displaced. Refer to Ember and Pan
Material Placement in owner's manual.
2. Reinstall logs starting with the rear log,
front logs, then remaining top logs. Refer
to Log Placement in owner's manual.
3. Leak check gas control and any con-
nections you've made before operating
appliance. Refer to Gas Supply Hook-up
in owner's manual.
4. Replace refractory access panel and lava
rock.
5. Replace glass doors if previously in-
stalled. Refer to Installing Optional Glass
Doors in owner's manual.
The conversion is now complete.
To operate your fireplace, refer to Operating
Fireplace in your appliance owner's manual.
WArNINg: Test all gas piping
and connections, internal and
external to unit, for leaks after
installing or servicing. Correct
leaks at once.
WArNINg: Never use an
open flame to check for a leak.
Apply commercial leak test so-
lution to all gas joints. Bubbles
forming show a leak. Correct all
leaks at once.
108805-01C
kit shall be installed by a quali-
fied service agency in accor-
dance with the manufacturer's
instructions and all applicable
codes and requirements of the
authority having jurisdiction. If
the information in these instruc-
tion is not followed exactly, a
fire, explosion, or production
of carbon monoxide may result
causing property damage, per-
sonal injury, or loss of life. The
qualified service agency is re-
sponsible for the proper installa-
tion of this kit. The installation is
not proper and complete until the
operation of the converted appli-
ance is checked as specified in
the manufacturer's instructions
supplied with the kit.
www.desatech.com
WArNINg: This conversion
5

Advertisement

loading