Gas Supply; Gas Pressure Check / Output / Efficiency - Pacific energy BROADWAY Installation And Operating Instructions Manual

Series a direct vent gas insert
Table of Contents

Advertisement

INSTALLER
INFORMATION
Servicing of the appliance can be performed from the front of the unit by removing the front trim, or by removing the
gas tray from the unit.
Caution: The gas line should be installed by a qualified service person in accordance with all building codes. This
section is intended as a guide for qualified technicians installing this appliance. Consult local and/or national building
codes before proceeding.
Gas supply line connection is located on the side of the insert. Gas connection accepts a 3/8" N.P.T. fitting.
Correct gas line diameter must be used to assure proper operation and pressure.
The fireplace input rating is shown in the chart below.
A drip leg must be installed in the gas supply line going to the gas control valve to -minimize the possibility of
any loose scale or dirt within the gas supply line from entering the control valve.
It is essential that a union or flanged connection be installed just upstream of the valve and inside the control
compartment to allow for repair or replacement of the gas valve.
Check local codes for additional requirements.
Turn on the gas supply and check that all connections are tight and leak free.
WARNING: The gas tray including gasket must be reinstalled after
conversion/installation or servicing has been completed.

Gas Pressure Check / Output / Efficiency

Please refer to following page for gas pressure testing procedure.
Gas pressure requirements
Input Pressure
Minimum
Maximum
Manifold Pressure
High
Low

Gas Supply

Natural Gas
Propane
4.0" WC
11.0" WC
13.9" WC
13.9" WC
3.5" WC
10" WC
1.6" WC
6.4" WC
Broadway
Gas
Orifice
NG
1.98mm
LP
1.25mm
Brentwood
Gas
Orifice
NG
2.55mm
LP
1.50mm
22
Output
AFUE
18,000 btu/hr
76%
17,000 btu/hr
76%
Output
AFUE
30,000 btu/hr
75%
26,000 btu/hr
75%

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents