Section H; Test Run - Toyotomi HC-20 Installation And Operation Instructions Manual

Heat convector
Table of Contents

Advertisement

HC-20_US.qxd 14.7.1 9:13 ページ 14

SECTION H:

TEST RUN

1. Make sure there is no water leaking from the unit and piping.
2. Make sure electrical connections and grounding are wired properly.
3. Check for air trapped in the plumbing.
1. Plug into the receptacle.
2. Press the
Power switch to ON position. Power lamp will come on.
3. When the hot water at the temperature of 100˚F (38˚C) or more flows into the unit, the Fan will start rotating.
If at any time a power failure occurs during operation, the time, timer and temperature settings will be erased. When
the power returns, the unit will automatically restart with the following conditions.
Operation mode: The unit will restart in AUTO FAN mode.
TIMER:
Set temperature: The Set temperature will resume to the previous temperature set.
Child Lock:
The power lamp will blink to indicate that a power failure has occurred and that the time and timer has been erased.
To stop the blinking power lamp, press any button once.
PREPARATION
OPERATION
POWER FAILURE RECOVERY SYSTEM
The Timer settings will be reset. Please reset the TIMER. (See page 12 TIMER OPERATION)
The Child Lock will be restored to the previous setting.
14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents