Vent Termination - Heat & Glo GEM36 Installer's Manual

Table of Contents

Advertisement

If the area above the ceiling IS an attic, position and secure
the firestop on top of the previously framed hole.
NOTE: Keep insulation away from the vent pipe at least
1 inch (25mm).
CEILING
CEILING FIRESTOP
Figure 19.
Attic Firestop
NAILS (4 REQUIRED)
RAFTER
Heat & Glo • GEM36 • 370-900 Rev. O • 2/05
C. Vent Termination
For Horizontal Terminations - To attach and secure the
termination to the last section of horizontal vent refer to the
Cinch Pipe and Termination Cap installation instructions.
• Push and snap-lock the ends as described at the begin-
ning of the Installing Vent Components section.
• The termination kit should pass through the wall firestops
from the exterior of the building.
• Adjust the termination cap to its final exterior position on
the building.
WARNING: THE TERMINATION CAP MUST BE
!
POSITIONED SO THAT THE ARROW IS POINT-
ING UP.
For trapezoidal cap termination kits:
• Using screws secure the cap to the exterior wall through
the flanges in the cap.
WARNING: VENTING TERMINALS SHALL
!
NOT BE RECESSED INTO A WALL OR SID-
ING. VENT TERMINATION CLEARANCES MUST
BE FOLLOWED TO AVOID FIRE DANGER. SEE
VENT TERMINATION MINIMUM CLEARANCES DI-
AGRAM ON THE FOLLOWING PAGE.
Figure 20. Trapezoid Termination Cap
7 1/4"
(184mm)
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents