3. Recall the schedule display.
[SC
ULE 1
HED
Recalling scheduled items from the SCHEDULE mode
To recall the schedule directly from the SCHEDULE mode in forward or
reverse direction, first set the SCHEDULE mode and then press rl (to
recall the next day and future days) or r] (to recall the last and previous
days) as required.
For example, to recall the schedule for January 10, 1992 (today):
1. Select the SCHEDULE mode and display the today's schedule.
2. Recall the schedule for the next day.
V
The agenda for the next day will be
displayed. If there are several items
scheduled on the same day,
use
chronological
to recall them in
order.
THU 2/20/' 92
ABC Project
meeting
F R I 1/10/'92
SAT l/11/*92
35