Sony MZ-E800 Service Manual page 10

Hide thumbs Also See for MZ-E800:
Table of Contents

Advertisement

MAIN BOARD
5 bracket (A)
7 case, battery
bracket (A)
A
Note: In mounting the bracket (A) on the MAIN board,
let the part
through under the MAIN board in
a
arrow A direction, and then insert the part
into the MAIN board.
OP SERVICE ASSY (LCX-2E)
7 OP service assy
(LCX-2E)
1 screw (1.4), MI
4 boss
6 Remove the two solders of
open/close detect switch
(S809)
b
a
MAIN board
b
5 bearing (N)
Note: In disconnecting the solder
on the terminal board (minus)
side, take care not to allow
the soldering iron to touch
the open/close detect
switch (S809).
battery terminal (plus) assy and
terminal board (minus).
8 MAIN board
3 three screws (1.4), MI
3 two screws
6 screw block assy, lead
4
– 10 –
2 bracket (B) block assy
1 three screws (1.4), MI
1 washer (0.8-2.5)
2 gear (SA)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents