/ ; ; h e
FR-A1OOE inverter can be operated in any of three modes. Select the
appropriate mode for an application and running conditions and prepare
required instruments and parts.
Note: This inverter is desiged for use with the
F R - P U 0 2 - 1
or
F R - A R W E - 1
parameter units. If a previous type of parameter unit is used the inverter
will not start in external or communication mode as Pr. 75 is factory set
to
" 1 4 " .
Like wise if a previous parameter unit (not
F R - P U 0 2 E - 1
or FR-ARWE-I)
is connected during inverter operation, the inverter will be decelerated
to a stop. (Refer to page 100.)
2.1.1
lnstruments and Parts to be Prepared before Operation
lnstruments and parts to be,prepared
1
-
Operation performed with the
externally provtded frequency
setting potentiometer and start
switch
B
Start signal
Switch, relay, etc.
Frequency setting signal
0 to 5V, 0 to 10V, 4 to 20mA DC signals
from a potentiometer or outside the in-
verter
Inverter
r - - - 7
I
I
I
I
;
PU
;
I
I
L - - - 4
1. External operation mode
0
I
- ,
~
$
~
J
o
Potenti-
I
The inverter is operated under the control of external opera-
tion slgnals connected to the terminal block.
J
ometer
i
I
Note: 1. Not only the start signal but also the frequency
setting signal are required to run the inverter.
I
Started from the PU.
Direct setting of frequency
Stepped frequency operation
I
instruments and parts to be prepared
I
Parameter unit
(FR-PUOSE-I)
Cable
(FR-CBL) (See page 190)
run the motor.
mode
Inverter
1
Use this cable when the pa-
rameter unit is held in hand
to perform operation, for ex-
I
The inverter'is operated from the keypad of the
parameter unit.
This mode does not require the operation signals and is use-
f u l for an immediate start of operation.
3
0
I
Instruments and parts to be prepared
I
Start signal
Switch. relav. etc.
.
,.
Frequency setting signal
0 to 5V, 0 to 10V, 4 to 20mA DC
'
Start signal is an external
signal.
Started by the ~ ~ e r a t i o n ~ c o m m a n d
key of the
PU.
signals from a potentiometer or
outside the inverter
'
Frequency
IS
set from the
PI1
Frequency is set from the external frequency
setting potentiometer.
Parameter unit
(FR-PUOSE-I)
3.
ExternalIPU combined
Cable
(FR-CBL) (See page 190)
L e i
~ o Z n t i o m e t e r
Start switch
/
operation mode
The inverter is operated with the external operation and PU
operation
modes combined in either of the following two
methods.
I
Use this cable when the parame-
ter unit is held in hand to perform
operation, for example.
1)
The external signal is used as the start signal and the
PU is used to set the frequency.
I
*:
"PU" stands for the parameter unit.
2)
The operation command key of the PU is used to start
and the external frequency setting potentiometer is
used to set the frequency.
J