Liebert UPStation GXT 2U User Manual page 15

Hide thumbs Also See for UPStation GXT 2U:
Table of Contents

Advertisement

5. Prepare the UPS or battery
cabinet (the "equipment") for
rack mounting by following
instructions in the
equipment's user manual. The
equipment may require
additional parts to be added or
parts to be removed for rack
mounting. After it is prepared,
lay equipment in rack-
mounting position. Fasten
inner members from Step 2 to
the equipment on both sides
as shown in the figure at right with (8) M4 screws provided in this
kit. Make sure retaining latch is near the rear of the equipment as
shown in the figure at right.
6. Open grease packet
provided in this kit. Apply
a 1" long bead of grease
four (4) places inside the
bottom, curved tracks of
front members as shown at
right. The grease will allow
the equipment to slide into
the bracket assemblies
more easily.
CAUTION
!
Lifting equipment into rack may be a two-person job,
depending on weight of equipment. See equipment's user
manual.
7. Insert the equipment, with inner members attached from Step 5,
into bracket assemblies by inserting top and bottom edges of inner
members into the top and bottom, curved tracks of front members
and sliding the equipment into rack (see figure in Step 6). Ends of
inner members are tapered to allow rear of the equipment to be
angled upward before insertion, if space allows.
Then the rear, bottom edges of inner
members can be placed into front
edge of bottom tracks, and the front of
the equipment can be tipped up into
horizontal position to insert the top
edges of inner members before sliding
the equipment into rack (see figure at right). The equipment
should move smoothly into bracket assemblies. If not, recheck
alignment of front and rear members from Steps 3 and 4.
M4 screws
UPS or battery
cabinet
Front
M4 screws
UPS or
battery
cabinet
11
Installation
Retaining latch
Apply
grease
Apply
grease
(inside)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents