Buderus 500-24S Installation And Maintenance Instructions Manual page 22

Gas wall hung boiler condensing
Hide thumbs Also See for 500-24S:
Table of Contents

Advertisement

1
Installation
1.9.4
Standard 100 mm flue systems
The standard concentric flue system provides for a maxi-
mum horizontal straight length of upto 12.0 m for 60/100
flue connection (
subsection 1.9.3).
Full instructions for fitting this flue are in subsection 1.9.7:
"Installation of the horizontal flue" on page 23.
IMPORTANT
Any horizontal flue system fitted to a conden-
sing boiler must be inclined towards the ap-
pliance at an incline of 50 mm per metre
length to prevent condensate dripping from
the flue terminal. This means that the clear-
ance above the appliance must be increased
to match the duct length. See figure on
page 8.
NOTE
Take into account the extra depth of the boil-
er when using the wall-spacing frame.
1.9.5
Connecting the vertical flue adaptor
V Push the vertical flue adaptor (
appliance flue connector. Ensure that the flue adapter
is fully engaged into the top of the boiler.
1.9.6
Connecting the horizontal flue turret
V Push the horizontal flue turret (
appliance flue connector. Ensure that the flue turret is
fully engaged into the top of the boiler.
22
fig. 22) onto the
fig. 22) onto the
Buderus 500-24S - Subject to modifications resulting from technical improvements
Fig. 24 Vertical flue adaptor
1
Fig. 25 Horizontal flue turret with flue gas testing point
1
Flue gas testing point
7215 3100-24.1TD
7215 3100-25.1TD

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents