York YDCFS-022C15B Installation Manual page 11

Floor standing type indoor unit
Table of Contents

Advertisement

Use the market brass pipe.
Be sure to use the same insulating materials when you buy the brass pipe. (More than
9mm thick)
Use frozen oil
2. Locate The Pipe
1) Drill a hole in the wall (suitable just for the size of the wall conduit, 90mm in general), then
set on the fittings such as the wall conduit and its cover.
2) Bind the connecting pipe and the cables together tightly with binding tapes. Do not let air
in, which will cause water leakage by condensation.
3) Pass the bound connecting pipe through the wall conduit from outside. Be careful of the
pipe allocation to do no damage to the tubing.
3. Connect the pipes.
4. Then, open the stem of stop valves of the outdoor unit to make the refrigerant pipe conne-
cting the indoor unit with the outdoor unit fluently flow.
5. Be sure of no leakage by checking it with leak detector or soap water.
6. Cover the joint of the connecting pipe to the indoor unit with the soundproof/insulating
sheath (fittings), and bind it well with the tapes to prevent leakage.
Bend the pipe with thumb
Min-radius 100mm
Chart 11
Chart 12
Chart 13
9
Make the ends
straight

Advertisement

Table of Contents
loading

Table of Contents