Desa V32S Owner's Operation And Installation Manual page 11

Unvented (vent-free) universal firebox
Table of Contents

Advertisement

NotIce: If your installation does
not meet the minimum clear-
ances shown, you must do one
of the following:
• raise the mantel to an accept-
able height
• remove the mantel
buIlt-IN FIRebox INstAllAtIoN
Built-in installation of this firebox involves
installing firebox into a framed-in enclosure.
This makes the front of firebox flush with wall.
Optional brass trim accessories are available
(see Accessories, page 18). The brass trim
will extend past sides of firebox approximately
1/2". This will cover the rough edges of the
wall opening. If installing a mantel above the
firebox, you must follow the clearances shown
in Figure 6. Follow the instructions below to
install the firebox in this manner.
1. Frame in rough opening. The firebox fram-
ing should be constructed of 2 x 4 lumber
or heavier. Use dimensions in Table 1
and rough opening layout in Figure 7a.
Adjust framing so that firebox flushes
with finished wall surface. If installing in
a corner, use dimensions in Figures 7b,
7c and 7d for rough opening.
2. Install gas piping to firebox location. See In-
stalling Gas Line, page 12 and Connecting
to Gas Supply in log set owner's manual.
Wall board or facing
material (above
firebox) may be of
combustible material,
including decorative
mantel ornaments or
other similar projec-
tions off of the facing
material.
Framing
Material
Firebox
Wire-mesh
Screen
Figure 6 - Minimum Mantel Clearances
for Built-In Installation
108662-01K
INSTALLATION
Mantel Shelf
Note: Any portion of the
mantel shelf must NOT
extend beyond this profile.
12"
6
"
3
/
4
1
1
"
/
2
Noncombustible
Material May
12" 16" 20"
Project Off this
Surface above
the Firebox Hood
Note: All vertical
measurements are
Supplied
from top of fireplace
Firebox Hood
hood opening to
Must Be Used
bottom of mantel shelf.
at All Times
These minimum
clearances replace any
other recommended
clearances supplied
with your ANSI Z21.11.2
approved gas logs.
www.desatech.com
Continued
table 1
rough opening Dimensions for
Model
(Inside to Inside)
32"
36"
42"
Figure
7a
FOR 32" MODELS
Figure
7b
*10
/
"
1
2
FOR 36" MODELS
Figure
7c
50
FOR 42" MODELS
Figure
7d
58"
*17"
* These dimensions allow for min. Clearances to
a 45° projected side wall. However, clearances
to projected mantel trims and facings are allowed
within a min. Of 16" to a perpenducular wall as
shown in figure 5, on page 10.
Figure 7 - Rough Opening for Installing
built-in Installation
Front Width
Height
34
/
"
36
7
8
41
/
"
40
1
2
48
/
"
44
5
8
Depth
(Minimum)
Height
Width
(Inside to Inside)
0" CLEARANCE
39
/
"
3
8
34
/
"
1
2
55
/
"
5
8
/
"
3
8
41
/
"
1
2
71
/
"
1
4
0" CLEARANCE
*17"
48"
82"
in Wall
Depth
(Min.)
/
"
16
/
"
3
1
4
4
/
"
20
/
"
1
3
2
4
/
"
22
/
"
1
5
2
8
27
/
"
3
4
*10
/
"
1
2
0" CLEARANCE
35
/
"
5
8
*14
/
"
1
2
41"
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents