PEUGEOT 125 CC Workshop Manual page 38

4-stroke engine
Hide thumbs Also See for 125 CC:
Table of Contents

Advertisement

REFITTING SPECIFIC COMPONENTS
- Place the camshaft gear (1) in the timing
chain so that you can immobilize it using the
adjustable pin wrench P/N 752237.
- Fit the camshaft gear screw but do not tighten
it.
- Fit the chain tensioner seal (respect the
position of installation).
- Install the chain tensioner and the
2 attachment screws.
- Install the spring and its screw.
- Tightening torque: 1 m. daN.
- Immobilize the camshaft gear using the
adjustable pin wrench P/N 752237.
- The lower strand of the chain shall be kept
taut.
- Tighten the camshaft gear screw.
- Tightening torque: 2.3 m.daN.
Checking the timing:
- Remove the 2 timing pins.
- Rotate the engine twice: 2 revolutions in the engine's operating direction (clockwise).
- Fit once again the pins in order to make sure timing is set correctly.
- If the pins do not enter reset the timing.
- Fit the plug over the cylinder head gauging hole.
36
Reproduction or translation, even partial, is forbidden without the written consent of Peugeot Motocycles
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

150 cc

Table of Contents