International comfort products C9MPX Installation Instructions Manual page 30

95+ single stage, category iv, gas furnace
Table of Contents

Advertisement

2.
Check hole sizes by making sure it is smaller than the
couplings or elbows that will be installed on the outside. The
couplings or elbows MUST prevent the pipe from being
pushed back through the wall.
3.
Extend vent pipe and combustion air pipe through the wall
3
/
" (19.1mm) to 1" (25.4mm) and seal area between pipe
4
and wall.
4.
Install the couplings, nipple and termination elbows as
shown and maintain spacing between vent and combustion
air piping as indicated in Figure 22 and Figure 23.
A metal shield is recommended 18" x 18" (457.2mm x 457.2mm)
min. or 18" (457.2mm) min. diameter around the vent termination
at the exterior wall to protect the house exterior materials from flue
product or condensation (freezing) damage.
Using Exterior Risers
1.
Install elbows and pipe to form riser as shown in Figure 23.
2.
Secure vent pipe to wall with galvanized strap or other rust
resistant material to restrain pipe from moving.
3.
Insulate pipe with Armaflex or equivalent moisture resistant
closed cell foam insulation or fiberglass insulation if boxed
in and sealed against moisture.
Sidewall Termination with Exterior
Risers to Get Above Snow Level or
Figure 23
Grade Level
8" (203.2mm)* MIN.
20' (6.1m) MAX
INLET
EXHAUST
GRADE LEVEL
OR
SNOW LEVEL
Vertical Termination
1.
Figure 25 shows the proper installation and clearances for
vertical vent termination. The vertical roof termination
should be sealed with a plumbing roof boot or equivalent
flashing. The inlet of the intake pipe and end of the exhaust
vent must be terminated no less than 12" (307.8mm) above
the roof or snow accumulation level, and 12" (307.8mm)
away from a vertical wall or other protrusion.
2.
If the vent system is installed in an existing chimney make
sure clearances shown in Figure 25 are maintained.
Horizontal section before the termination elbow can be
extended on the inlet air to provide necessary clearance.
30
*18, (457.2mm) Minimum for
cold climates [sustained 0_F
(-17_C) and below for 24 or
more consecutive hours]
8" (203.2mm)
MIN.
12 " (304.8mm)
MIN.
25-00-04F
Specifications are subject to change without notice.
Recommended Alternate Installation
Figure 24
for Sustained Cold Weather [05 F(-175C) & below for 24
hours or more consecutive hours]
EXHAUST
12, (304.8mm) MIN.
FRONT VIEW
Same Joist
Space
Rooftop Termination
Figure 25
B
A
A = 12" (304.8mm) Above roof or snow accumulation level
B = 8" (203.2mm) Min., 20' (6.1m) Maximum, except in areas
with extreme cold temperatures [sustained 0°F(−17°C) and be-
low for 24 or more consecutive hours], the 18" (457.2mm) Min.
Vent Termination Shielding
Under certain wind conditions some building materials may be
affected by flue products expelled in close proximity to
unprotected surfaces. Sealing or shielding of the exposed
surfaces with a corrosion resistant material (such as aluminum
sheeting) may be required to prevent staining or deterioration. The
protective material should be attached and sealed (if necessary) to
the building before attaching the vent terminal.
OVERHANG
905
INLET
12, (304.8mm) MIN. Ground
Level OR Snow Level
SIDE VIEW
12,
(304.8mm)
25-23-73
A
440 01 1051 02

Advertisement

Table of Contents
loading

This manual is also suitable for:

H9mpxT9mpx

Table of Contents