Figure 18
Horizontal Right through Top
Trap Connection
"Clamp ears"
Pointed OUT
Preassemble &
insert into furnace
Relief Tube Extension
Black Rubber
Cut to Fit (Loose Parts Bag)
Horizontal Right through Top
Disconnect the hoses from the trap assembly, and remove trap
and trap mounting bracket from the blower compartment. Using
cover plate and gasket provided in the loose parts bag, cover the
hole from the burner compartment to the blower compartment and
secure with screws.
Remove knockout from the side of the furnace casing where drain
tube will exit.
Mount the trap externally to the bottom side of the unit using the
two screws provided in the location shown.
Cut the corrugated tube as shown in the illustration above.
Connect the corrugated hose from the transition to the trap.
Secure connections with clamps.
1
Connect the black
/
" (12.7mm) ID drain tube from the Vent Drain
2
to the trap. If an extension is required, use the black
OD barbed coupling and the black
the loose parts bag. Cut tube to length. Secure connections with
clamps.
26
Single Pressure Switch Detail
Relief Tube Black Rub­
, (4.8mm) ID
3
ber
/
16
Flexible Tubing Connector
, (4.8mm) OD (Loose
3
/
16
Parts Bag)
, (4.8mm) ID
3
/
16
Drain Tube Corrugated
& Clamps Cut at straight section
Leave room for clamp
Representative drawing only, some models may vary in appearance.
(See Figure 18)
1
/
" (12.7mm)
2
1
/
" (12.7mm) ID drain tube in
2
Specifications are subject to change without notice.
, (4.8mm) ID
3
/
16
Rubber Tube
AIRFLOW
Coupling & Clamps
(Optional)
WARNING
Add Cap and
Clamp
Dual Pressure Switch
, (15.9mm) ID
5
/
8
Cut Here
3
Connect the
/
" (4.8mm) ID relief tube to the middle port on the
16
trap. If an extension is required, use the clear
flexible tubing connector and the black
in the loose parts bag. Cut tube to length.
Cut an appropriate length of 2" (50.8mm) PVC pipe, fittings and
extension pipe long enough to exit the cabinet and connect the
vent drain to a standard field supplied 2" (50.8mm) PVC tee
Install tee trap into bottom section of tee.
Connect the tee trap and the main drain line exiting the casing as
shown in Figure 20.
Note:
It is recommended that all PVC piping and fitting
connections be fit up and inspected before final cementing. Both
the external trap and the external tee trap must be primed
before operation. Verify all condensate drain connections are
securely clamped. A coupling and clamps (in loose part bag) may
be installed as shown for future servicing of the vent system.
Alternate
Orientation
Plastic Cap
Yellow or black
Field
Vent Drain
Supplied Tee
& Clamps
Tee Trap
White PVC
(loose parts bag)
Elbow Tube Black Rubber
ID & Clamps (Loose Parts Bag)
INLET
On Some Models
ONLY
Barbed Coupling
OD (Loose Parts Bag)
Drain Tube Black Rubber
, (12.7mm) ID & Clamps
1
/
2
3
/
" (4.8mm) OD
16
3
/
" (4.8mm) ID relief tube
16
440 01 1051 02
,
1
/
2
, (12.7mm)
1
/
2
25−24−89